Date: 7 months ago   Category: Transport

China finished construction of the part of the bridge through Amur — Rambler News Service


Photo: Yury Smityuk / TASS China finished construction of the part of the railway bridge crossing between Russia and the People's Republic of China through Amur River, Xinhua reports. Total length of transition of Nizhneleninskoye in the Jewish Autonomous Region — Tongjiang in the Chinese province of Heilongjiang on the project is 31,62 km. The main section of the bridge consists of 20 flights and makes in length of 2215 m. China had to construct 1900 m (17 flights) of them. At the same time investments of China into the project made 2,642 billion yuans. The project of construction of the border bridge crossing through Amur River is implemented by RKIF together with Fund of development of the Far East and Baikal region. The bridge crossing will have capacity to 21 million tons per year and will connect the Jewish Autonomous Region to the Chinese province of Heilongjiang. The bridge will allow to create a new export corridor between Russia and China. Transition will reduce transportation distance to the end user approximately by 700 km in comparison with other operating export railway routes.

URL:

The Federal Antimonopoly Service issued the warning to the Gett taxi aggregator connected with possible blocking of users of the rival aggregator, the Muver application it is noted in prevention in base of FAS decisions. The service Gett does not agree with claims, the company is not informed on the FAS decision, Maxim Zhavoronkov, the director of...


Belarus lifted limits for export of the Belarusian oil products because of low-quality oil from Russia, BelTA with reference to the words of the chairman of Belneftekhim concern Andrey Rybakov reports. "The ban on export is completely withdrawn, there is only one obligation - it is ensuring domestic market in full" — Rybakov said. It is reported th...


Photo: TASS / BelTA Restoration of transit of the Russian oil through Belarus on the Friendship pipeline is in full possible by the end of July, BelTA with reference to the words of the chairman of Belneftekhim concern Andrey Rybakov reports. "The term of implementation of all road map — until the end of July of the current year. It is the maximum...


The head Gazprom Alexey Miller discussed the course of implementation of the project of construction of the Nord Stream-2 gas pipeline with the head of the Austrian oil and gas company OMV Rainer Seele, it is said in the statement of the Russian gas holding following the results of a meeting. "The course of implementation of the Nord Stream — 2 pro...


On two branches of the Moscow subway the movement stopped, follows from the message of the subway on Twitter. "On Solntsevo (8A) and Big ring (11) lines there is no train service from ''Раменок'' to ''Хорошевской''. In the opposite direction trains go with the increased interval" — it is said in the statement. The st...


Photo: Artyom Korotayev/TASS on May 21 the U.S. State Department imposed new sanctions against the enterprises of the Russian military industrial complex (MIC). This time under restrictions got Instrument Design Bureau of Shipunov in Tula, training center of antiaircraft rocket troops in Gatchina and the Moscow engineering plant Avangard. Too succe...